FAQ
Frequently Asked Questions
Best Manufacturing Industry
The budget and a reasonable time frame are stated in the contract, which is signed by all parties with copies provided before the start any project. If by chance the project does run late it is usually caused by two reasons; one, weather and two, materials deliveries. If it's not due to nature or outside forces, we do what we say, when we say.
We are very blessed to say that over 50% of our customers come to us or are referred to us from customers we've performed for in the past. As you will see when you check our references, there is a reason for such a loyal client base.
Again, these terms are broken down in the contract based on progress with a completion date included. Typically we take a deposit of 10% for materials, and the rest of the payments are determined beforehand. Once the work is completed to a pre-determined point, a pre-determined payment is made, with final payment due upon completion. This is called progress payments.
Depending on your location and what is being done, a permit might be required or it may not. If a permit is required for your project, we will obtain the permit, handle all inspections, make sure everything is built to code, and that the project and process satisfies all requirements to the letter of the law.
important materials are specified in the contract. All materials are covered, however, as substitutions are sometimes unavoidable (lots of bricks run out, for example, colors of materials are sometimes no longer made), we make it clear that an equal substitution will be made but only upon your approval. For items such as lighting fixtures or doorknobs that you have not chosen when the contract is signed, a budget is determined in the contract to cover exactly what will be spent on them.
The timeline for completion of your design build project will vary depending on the scale and complexity of your building design and building construction needs. As your general contractor, we work with our clients through every step of their project to establish clear schedule expectations and a realistic timeline for completion.
Yes, absolutely! This is your design and project, and your wants and needs should always be kept front of mind by your contractor. As a construction company, Millennium Construction, Inc. is proud to usher in a “New Era of project”, putting the customer first in all aspects of the design build process.
The five stages of construction are: Initiation, Planning, Execution, Monitoring, Completion.
A change order is a written statement signed by the customer authorizing the contractor to do additional work not included in the original contract. The change order should be signed before the additional work is started, but often it is not in order to keep the project moving. The amount specified is due when the project is completed. A change order also may be written when a contractor comes across any unforeseen damage or problem.